pine logs ready to haul
Posted: Wed Jun 03, 2020 1:05 pm
take a look at this craigs list ad. the material looks decent and we REALLY need 16' material to complete the rafters for the 2nd engine building.
I could haul the skid steer there to load, and have 2 trailers capable of 5 ton loads each, one for long material and one for 12' stuff.
we would need an unloader at the farm, and some chain saw work on site.
only issue is it is in Quinebaug, a fair ride from the farm. the round trips are probably 3+ hours, so two loads in a day for each truck available.
Volunteers with trailers for a Saturday or Sunday would be needed!
https://newlondon.craigslist.org/zip/7110163306.html
thoughts?
I could haul the skid steer there to load, and have 2 trailers capable of 5 ton loads each, one for long material and one for 12' stuff.
we would need an unloader at the farm, and some chain saw work on site.
only issue is it is in Quinebaug, a fair ride from the farm. the round trips are probably 3+ hours, so two loads in a day for each truck available.
Volunteers with trailers for a Saturday or Sunday would be needed!
https://newlondon.craigslist.org/zip/7110163306.html