Electrical Projects 2023-2024

Post by Dave C »

Electrical "Tickets" for the next 2 years

1. Install Lights and Switches at front and rear doors of Tractor Barn

2. Install Complete electrical system in Chester Building (including a 220V outlet for a welder, please -CB) COMPLETED

3. Install RV outlets on post behind Engine 1/ Chester Building

4. Install RV outlets behind Tractor Building

5. Install RV outlets behind Woodworking building (this will require Excavation crew)

6. Replace lights in Engine 1 COMPLETED

7. Install 2 additional lights in Tractor Building

8. Install correct hanging cables on all existing lights Tractor Building

9. Install outlet on front of kitchen for TV COMPLETED

10. Push conductors back into Trough in engine building and close cover COMPLETED

11. Rewire water pump for Fairbanks and connect to 220volt line with disconnect and motor starter. COMPLETED

12. Cleanup wires in trough below Fairbanks water pump COMPLETED

13. Clean up wiring outside engine 1 by compressor. COMPLETED

14. Install Conduit, boxes, switch box and Lights (6) 4 foot LED in Attic of New Repair Shop. 


15. Install outlets, lights, switches in Toolroom on Engine 1. COMPLETED