Construction Projects out 2023 and 2024

Moderators: Aleks P, RickPT3090, Directors

Forum rules
All Directors can add and Edit posts in this section! If you make a change add your Initials next to the item you add or change. if you delete something make a note of that with your Initials Also. thanks
Post Reply
Dave C
Site Admin
Reactions:
Posts: 230
Joined: Wed Mar 04, 2020 9:08 pm
Location: Wallingford
Name: David Chester
Contact:

Construction Projects out 2023 and 2024

Post by Dave C »

Building projects, Maintenance Items, and New projects projected for the next 2 years

in no particular order This post will be open to Directors to add, delete, modify etc

1. Build Tool room backside of Engine Building 1, Paint/Stain IN PROGRESS

2. Replace Front Facia Board on Rear repair shop, Paint/Stain

3. Repaint Engine Building 1

4. Paint Chester Building COMPLETED

5. Install Railing system on Pavilion and both Engine Building covered porches. Paint/Stain (added engine building porch railings so we don't need to string up ropes. -CB) COMPLETED

6. Close in Attic of Kitchen, Paint/Stain, Insulate ceiling

7. Build Additional Bay on Rear Repair Shop left side. (will require drawings permits etc.)

8. Install Gutters and Downspouts on All Buildings on Property. PARTS ON ORDER
a. Chester Building
b. Engine 1
c. Pavilion
d. Woodworking
e. Rear Repair Shop
f. Well House

9. Replace Windows on Engine 1 with Glass Windows, Add 2 Gable End Windows COMPLETED

10. Make space for new loading dock and move existing dock to new location (-CB)

11. Install drainage pipes for tractor building(dc)

12. Install water line to tractor building, RV post, woodworking building and rear repair shop. (Dc)

13. Install eyebrow over front door of Engine 1 building. Gutter will eliviate need for eyebrow.

14. Install drain pipe and add fill to pass through by machine shop.  (CBYD & AT&T need to ensure will not disturb fiber)

Post Reply