Search found 57 matches

by artc
Tue May 26, 2020 3:50 pm
Forum: Small Project List
Topic: road re-alignment at Sawmill COMPLETED
Replies: 1
Views: 23235

road re-alignment at Sawmill COMPLETED

We have been talking and looking at the issues at the sawmill with water and mud running into the take out side of the mill, as well as difficulty removing finished stacks of lumber. The loop road runs right next to the north corner of the mill making any regrading difficult with regard to maintaini...
by artc
Wed May 20, 2020 6:53 pm
Forum: Building and Construction
Topic: Pavilion project
Replies: 17
Views: 29495

Re: Pavilion project

concrete today!
concrete pour 5-20-2020.jpg
by artc
Wed May 20, 2020 1:46 pm
Forum: Small Project List
Topic: Clark Fork Lift COMPLETED
Replies: 2
Views: 28084

Re: Clark Fork Lift COMPLETED

great!
by artc
Wed May 20, 2020 1:44 pm
Forum: Small Project List
Topic: Saw mill water
Replies: 1
Views: 8142

Re: Saw mill water

Dave did a major re-organization of our log supply yesterday to get ready for logs that may or may not be coming from Salem. Part of the goal is to create a new alignment of the road to the left of 4 oak trees.  It will accomplish two things.  1. allow for a spectator only walkway from the new repai...
by artc
Mon May 11, 2020 1:47 pm
Forum: Building and Construction
Topic: Pavilion project
Replies: 17
Views: 29495

Re: Pavilion project

Gerry G helped me doing most of the final raking / grading and installing the form boards last weekend. Dave C. set the last of the under slab piping. Sunday I ran Sean's plate compactor over the project one last time and completed attaching the form boards to the concrete. Ready for concrete - hope...
by artc
Fri May 01, 2020 3:32 pm
Forum: Zagray Farm Members Talk
Topic: Tractor ride
Replies: 4
Views: 12416

Re: Tractor ride

cool piece! thank you Marc and Andy! While we are on the topic of the kids play yard: We need to move part of the fencing to accommodate the septic system, whenever we can build it.  I am thinking of shifting the existing fencing toward the pond about 20 feet, and away from the pavilion about 10 fee...
by artc
Thu Apr 30, 2020 5:36 pm
Forum: Building and Construction
Topic: Pavilion project
Replies: 17
Views: 29495

Re: Pavilion project

I'll be out Saturday and Sunday working on the pavilion. Supposed to be good weather. could use a hand finish grading, roller work, form boards (if we have them planed) and final under slab electrical.

Sean was running the roller 1st pass when I left last week, I don't know how far he got. 
by artc
Thu Apr 30, 2020 5:31 pm
Forum: Small Project List
Topic: Case forklift
Replies: 3
Views: 10409

Re: Case forklift

power washer is at my house. i'll bring it down. I had to delouse the blue tractor so I could see the failed water pump. it's awaiting parts.
by artc
Thu Apr 30, 2020 5:28 pm
Forum: Zagray Farm Members Talk
Topic: willy tedesco
Replies: 4
Views: 14027

Re: willy tedesco

Willie had an extensive library of manuals, I hope they survived.
by artc
Mon Apr 20, 2020 2:01 pm
Forum: Building and Construction
Topic: Pavilion project
Replies: 17
Views: 29495

Re: Pavilion project

Sunday was a decent day, so I thought I would back fill the power / comm. trench and fix the door to the construction building. Bill Bill arrived and took over the trench back fill operation so i helped re-install the repaired grizzly on our screener. then I moved on to completing the grading of the...